Today on the Llama 13-2 we spent the better part of the day laying flowlines from the tank battery across the pasture and onto the 13-2 location to the pumpjack, approx. 740′. We were also able to lay the SW line from the SW Pump to the SW Disposal well, approx. 1500′.

As of today the only thing we are waiting on to be able to turn the Llama 13-2 on is for East Central Electric to get power to us. 

Tomorrow we will be putting the finishing touches on the Llama 13-2 and then be moving over to the 13-1 to continue the completion process on that well.