As of late this afternoon, we had recovered approx. 470 bbls of the 600+ bbls of acid flush on the Llama 13-2 well. We have been getting some good gas up the backside and a pretty good oil cut. Late this afternoon we shut the well down due to an imbalance of the weights which was causing the motor to labor on the up stroke. First thing in the morning we will get the weights balanced and get the well turned back on. We still have quite a bit of fluid to recover after which we will have a good idea of a production rate.
The Llama 13-1 well has recovered approx. 525 bbls of the 760 bbls of acid flush. As of this afternoon the gas is building on the backside. As of yet we have not seen much of an oil cut probably need another couple of days to see any significant shows.
All in all everything is progressing as it should. I know you all are expecting a gusher blowing out the top. In reality that is not how it works. A couple more days of patience will tell us a lot.
I’ll update you again tomorrow evening as to the days progress.